Facility Directory Detail

  • Tradition Park Stormwater Detention Basin Flood Repairs

    Tradition Park Stormwater Detention Basin Flood Repairs
    1. Address:Ankeny
      Ankeny, IA 50023
    Categories:
    1. Construction

Project Description

The project includes repairing damage caused by the June 30, 2018 extreme flash flooding event.

Tradition Park Stormwater Detention Basin Flood Repairs - project location map

Project Contact

Amy Bryant

Phone: 515-963-3542

Anticipated Start Date

Fall 2019

Expected Completion Date

Winter 2019/Spring 2020

Progress Update

The project had been awarded and is anticipated to start in early fall.  -- updated 8/6/19 

The project is currently out to bid. -- updated 7/9/19

This project is currently under design.

Return to full list >>

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer